Algorithms 2018,11, 18
periodorprocessedacrossasetofadjacentperiodsconsistingofanoff-peakperiod,amid-peakperiod,
andanon-peakperiod.Obviously, theelectricitypricescorrespondingto thepositions in this layerare
relativelyhigher than layer1. In layer3, thevastmajorityof the jobsareprocessedacrossapairof
periodsconsistingofamid-peakperiodandanon-peakperiodorprocessedwithinanon-peakperiod.
Theelectricitypricesof thepositionscorrespondingto3rd layerare thehighest.
Then, all the jobsare sorted innon-increasingorderof their electricity consumptionratesand
assigned to the layerwitha lowerprice successively toachieve thepreliminarycoarsegranularity
filtering target. Once the layer towhicha jobbelongs isdetermined, thehuntingzoneofpossible
positions of a job is concentrated in a certain layer. In thefine granularity filtering stage, several
judgmentconditionsaresetuptodetermine thepositionofeach job tobe insertedusingcharacteristic
polynomials based on considering processing time, electricity consumption rate of the job, and
electricity price. What ismore, aiming tofind the optimal position, the hunting zone of possible
positionsofa job isproperlyexpandedin thisstage.
Assumingthata job, say job i,whoseprocessing timedoesnotexceedthedurationof theshortest
on-peakperiod, is tobe inserted, the ideaof theproposedalgorithmisgivenas follows.
Layer1 includesconditions1–2. If∃k∈A,ti≤maxk∈A{Ik}+ Ik+1, job i is assigned to layer1.
Obviously, at thevery start, theoff-peakperiodsarepreferentiallyoccupiedby the jobswithhigh
powerconsumptionrates, sinceall the jobsaresorted inadvance.
Condition1:∃k∈A,ti≤ Ik.
IfCondition1issatisfied, job icanbedirectlyprocessedwithinanoff-peakperiodwiththe lowest
electricityprice. Note that each jobprocessedwithinaperiod isplaced to the leftmost sideof the
period.AnillustrationisgiveninFigure3(i.e., job3 isa jobtobeinserted,and t3< I4). It isnoteworthy
that thesmaller thenumberof the job, thegreater thepowerconsumptionrate.
Figure3. IllustrationofCondition1.
Condition2: ti>maxk∈A{Ik}>0anddk+1>0.
WhenCondition2 issatisfied, itmeans that job icannotbeprocessedwithinanoff-peakperiod.
As a second-best choice, job i can be processed across periods k and k + 1 in such a condition.
Anillustration isgiven inFigure4.Note thatwhenthe job5 is inserted into theposition, it shouldbe
adjacent to job2.
Layer2 includesConditions3–5. If ti>maxk∈A{Ik}+ Ik+1 and∃k′ ∈B,ti≤ Ik′, job i isassigned
to layer2.
Condition3:maxk∈A{Ik}>0anddk+2>0.
Since dk+2 > 0, it follows that period k+2 always exists. Tominimize the electricity cost for
processing job i, theoff-peakperiodwithmaximal remaining idle time (period k) shouldbegiven
6
zurück zum
Buch Algorithms for Scheduling Problems"
Algorithms for Scheduling Problems
- Titel
- Algorithms for Scheduling Problems
- Autoren
- Frank Werner
- Larysa Burtseva
- Yuri Sotskov
- Herausgeber
- MDPI
- Ort
- Basel
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY 4.0
- ISBN
- 978-3-03897-120-7
- Abmessungen
- 17.0 x 24.4 cm
- Seiten
- 212
- Schlagwörter
- Scheduling Problems in Logistics, Transport, Timetabling, Sports, Healthcare, Engineering, Energy Management
- Kategorien
- Informatik
- Technik