Algorithms 2018,11, 18 Table1.TheTOUtariffsusedforall instances. PeriodType ElectricityPrice (CNY/kwh) TimePeriods On-peak 1.2473 8:00–11:30 18:30–23:00 Mid-peak 0.8451 7:00–8:00 11:30–18:30 Off-peak 0.4430 23:00–7:00 CmaxandCBdenote thegivenmakespanandthetotalprocessingtimesofall the jobs, respectively. Theparameter e=Cmax/CB (e≥1) isusedtomeasure thedegreeof timetightness. In these instances, Cmax can be obtained by the formulaCmax = e×CB as long as the parameter e is set. Obviously, as e increases,Cmax increases.Note that bm+1 is calculated by bm+1 = Cmax/24) ×24. LetTECF andTECHbethe totalelectricitycostcalculatedbyouralgorithm(GIH-F)andCheetal.’salgorithm (GIH), respectively. Theruntimesof the twoalgorithmsarerepresentedbyCTF andCTH, respectively. ThegapsbetweenTECFandTECHarerepresentedbyG,G=(TECF−TECH)/TECH×100%.Theratio ofCTH/CTF is representedbyR. 4.1.ARealCaseStudy TheMILPmodelandtheproposedalgorithmareapplied toaverticalmachiningcenter (SMTCL VMC1600P) fromamachinerymanufacturingcompanyshowninFigure8. In this real-life instance, the company receives someorders of processing rectangular partswith threeproductmodels for continuouscastingmachinesof thesteelplants. Figure9 is thepictureof the rectangularpart, and thecomplexcavitysurfaces including theplanes, cambersurfaces, andspherical surfacesare tobe processed on theVMC. Thepower consumptionper hour required by theVMC is related to the materialof the job, cuttingdepth, feedspeed,andsoon. Toobtain theaveragepowerconsumption rateof themachine,apowermeasurement isperformedusingapowermeter (UNI-TUT232), andthe measurementdata ispresentedbyTable2. Inaddition, theorderquantityof the threemodels is15,35, and10parts, respectively. Figure8.Verticalmachiningcenter. Figure9.Thegeometryof therectangularpart. 12
zurück zum  Buch Algorithms for Scheduling Problems"
Algorithms for Scheduling Problems
Titel
Algorithms for Scheduling Problems
Autoren
Frank Werner
Larysa Burtseva
Yuri Sotskov
Herausgeber
MDPI
Ort
Basel
Datum
2018
Sprache
englisch
Lizenz
CC BY 4.0
ISBN
978-3-03897-120-7
Abmessungen
17.0 x 24.4 cm
Seiten
212
Schlagwörter
Scheduling Problems in Logistics, Transport, Timetabling, Sports, Healthcare, Engineering, Energy Management
Kategorien
Informatik
Technik
Web-Books
Bibliothek
Datenschutz
Impressum
Austria-Forum
Austria-Forum
Web-Books
Algorithms for Scheduling Problems