Seite - 14 - in Algorithms for Scheduling Problems
Bild der Seite - 14 -
Text der Seite - 14 -
Algorithms 2018,11, 18
Finally, jobs3and4areassignedtohigh-price layer3,andtheybothsatisfyCondition6.Afinal
completeschedulingdiagramisgiven inFigure10c.
(a) Computational process diagram 1
(b) Computational process diagram 2
(c) Computational process diagram 3
Figure10. Illustrationof thecomputationalprocessofGIH-F.
Returningto thereal-life instance, letusnowtalkabout theefficiencyof theMILPmodelandthe
proposedalgorithm.Currently, thecompanyplans toproduce70-Model,40-Model,and100-Model
rectangularparts in7,3, and2daysrespectively. That is,fivepartsare tobeproducedeverydayfrom
8:00 to24:00. Thissuggests that itneeds12days toprocessall thepartsandthetotalelectricitycost
(TEC) canbecomputedas follows:
TEC70=4.7×(3.5×1.2473+7×0.8451+2.5×1.2473)×7=440.8CNY;
TEC40=4.4×(3.5×1.2473+7×0.8451+1.5×1.2473)×3=160.4CNY;
TEC100=5.3×(3.5×1.2473+7×0.8451+4.5×1.2473+0.5×0.4430)×2=170.8CNY;
TEC=TEC70+TEC40+TEC100=772.0CNY.
Figure11 is theschedulingresultdiagramof thereal-life instance. It canbeseenfromFigure11
thatwithourscheduling, the totalelectricitycost forprocessingall theparts is447.9CNY,whichcan
bereducedby42.0%.
14
zurück zum
Buch Algorithms for Scheduling Problems"
Algorithms for Scheduling Problems
- Titel
- Algorithms for Scheduling Problems
- Autoren
- Frank Werner
- Larysa Burtseva
- Yuri Sotskov
- Herausgeber
- MDPI
- Ort
- Basel
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY 4.0
- ISBN
- 978-3-03897-120-7
- Abmessungen
- 17.0 x 24.4 cm
- Seiten
- 212
- Schlagwörter
- Scheduling Problems in Logistics, Transport, Timetabling, Sports, Healthcare, Engineering, Energy Management
- Kategorien
- Informatik
- Technik