Algorithms 2018,11, 43 Steps2–4.Thesameas inheuristicH5. Algorithm8.Pseudo-codeofheuristicH7. HeuristicH8 Step1.Order jobsbytheMSTrule (tie-breakbythe lower∑pjk). Steps2–5. Thesameas inheuristicH6. Algorithm9.Pseudo-codeofheuristicH8. For the last two heuristics, H9 (Algorithm 10) uses the EDD rule as the initial order and H10 (Algorithm 11) the MST rule, both adopting a different form of neighborhood search, the forward/backwardprocedure. Thenewprocedure re-insert one job at a time in the last position inasequencebyconsideringthebest solutionfoundsofar,andtheniterativelyre-insert the last job inall otherpositions retaining theonewith thebestnJIT. This corresponds toadiverseway to test neighborsolutions (seeExample2). Example 2. Consider again the sequence: {J3, J2, J1, J4}. For position h=1, the first job J3 is replaced in the last position; if the newsolution is improved, thenewsequence is kept (andalso thevalueofh=1),otherwise, thepreviousone is recovered(andthehis incremented). Thus, if the currentsequence is {J2, J1, J4, J3}, thenthenewfirst job J2 is replacedinthe lastpositionandthetest is repeated for {J1, J4, J3, J2}. Consideringnowthat thenewsolution isnotbetter than theprevious one, thesequence iskept {J2, J1, J4, J3}andh=h+1=2. In thenextstep, thesecond job(i.e., theone in thehthposition) is replaced in the lastpositionandthe test is redone. This forwardprocedure is repeateduntil the (n−1)thposition. Then,abackwardprocedure isapplied, reinserting the last job in allpreviouspositions,andsoon. HeuristicH9 Step1. Order jobsbytheEDDrule (in thecaseofa tie,use the lower∑pjk). Step2. Apply the timingadjustmentprocedure. Step3. Seth=1.Whileh<n,do (fromposition1 ton−1): Forwardprocedure: replace the hth jobdefined inStep1 in the last positionof thepartial sequenceandapplythetimingadjustmentprocedure. If thenewnJIT isbetterthantheprevious one,keepthenewschedule (andthehvalue);otherwise,gobackto thepreviousoneandset h=h+1. Step4. Seth=n.Whileh>1,do(fromthe lastpositionto thesecond): Backwardprocedure:Replace thehth job inall thepreviouspositionsandapplythetiming adjustmentprocedureconsidering thebest solution found. If anewbest solution is found, keepthenewschedule (andthehvalue);otherwise,goback to theprevioussolutionandseth =h−1. Step5. STOP. Algorithm10.Pseudo-codeofheuristicH9. HeuristicH10 Step1.Order jobsbytheMSTrule (in thecaseofa tie,use the lower∑pjk). Steps2–5. Thesameas inheuristicH9. Algorithm11.Pseudo-codeofheuristicH10. 64
zurück zum  Buch Algorithms for Scheduling Problems"
Algorithms for Scheduling Problems
Titel
Algorithms for Scheduling Problems
Autoren
Frank Werner
Larysa Burtseva
Yuri Sotskov
Herausgeber
MDPI
Ort
Basel
Datum
2018
Sprache
englisch
Lizenz
CC BY 4.0
ISBN
978-3-03897-120-7
Abmessungen
17.0 x 24.4 cm
Seiten
212
Schlagwörter
Scheduling Problems in Logistics, Transport, Timetabling, Sports, Healthcare, Engineering, Energy Management
Kategorien
Informatik
Technik
Web-Books
Bibliothek
Datenschutz
Impressum
Austria-Forum
Austria-Forum
Web-Books
Algorithms for Scheduling Problems