Web-Books
im Austria-Forum
Austria-Forum
Web-Books
Informatik
Algorithms for Scheduling Problems
Seite - 66 -
  • Benutzer
  • Version
    • Vollversion
    • Textversion
  • Sprache
    • Deutsch
    • English - Englisch

Seite - 66 - in Algorithms for Scheduling Problems

Bild der Seite - 66 -

Bild der Seite - 66 - in Algorithms for Scheduling Problems

Text der Seite - 66 -

Algorithms 2018,11, 43 • Scenario4: hightardiness factor (T=0.4)andlargeduedaterange(R=1.2). Usingtheseparameters, 6000 instancesweregenerated inGroup1,dividedin60classes. That is, five levelsofnumberof jobs, three levelsofnumberofmachines, four scenariosand100 instances perclass (5×3×4×100=6000). ForGroup2,9600 instancesweregenerated,dividedin96classes, six levelsofnumberof jobs, four levelsofnumberofmachines, fourscenariosand100 instancesper class (6×4×4×100=9600). Atotalof15,600 instancesweregeneratedandtheirparametersare summarized inTable3. Table3.Parameters forgenerationof the instances. Group1 Group2 Numberof jobs 5,6,7,8,10 15,20,30,50,80,100 Numberofmachines 2,3,5 5,10,15,20 Scenarioconfigurations Scenario1:T=0.2andR=0.6; Scenario2:T=0.2andR=1.2; Scenario3:T=0.4andR=0.6; Scenario4:T=0.4andR=1.2 Numberof instancesperclass 100 100 Numberof instancespergroup 6000 9600 Totalnumberof instancessolved 15,600 5.2. Experiment1: RelativeComparisonof theProposedHeuristics In thisfirstpartof theresultsevaluation,arelativecomparisonof theproposedheuristicswas conducted. Themostcommonmeasureused in the literature tocompare theperformancesof solution methods is therelativepercentagedeviation(RPD) (e.g., [22,25]),which,adaptedto themaximization problemaddressed, is calculatedas: RPD=( nbestJIT−nhJIT nbestJIT )100, (14) wherenbestJIT is thebestsolutionfoundandn h JIT theheuristicsolutionevaluated. Thelowerisamethod’s RPD, thebetter is itsperformance,withaRPDofzero indicatingthat themethodprovidedthebest solutionfound(orachievedatie). Tocompare theheuristicsperformances forGroup1’s instances, thesolutionofanenumeration method (EM), basedon [25],wasusedas a reference (see thepseudo-code inAlgorithm12). It is important tonote that theEMprovidesareferencesolutionto theproblemand,althoughit listedn! possiblepermutations (sequences)of jobs, itdoesnotwarrantanoptimalsolutionsince theschedule iscomposedbysequencingandtiming. That is, for thesamesequence, it ispossible tofindseveral scheduleswithdifferentstarting times foreachoperation, therebyresulting inmanypossibilities for thesamenumberof just-in-time jobs,ascanbeseen inFigure1. 66
zurück zum  Buch Algorithms for Scheduling Problems"
Algorithms for Scheduling Problems
Titel
Algorithms for Scheduling Problems
Autoren
Frank Werner
Larysa Burtseva
Yuri Sotskov
Herausgeber
MDPI
Ort
Basel
Datum
2018
Sprache
englisch
Lizenz
CC BY 4.0
ISBN
978-3-03897-120-7
Abmessungen
17.0 x 24.4 cm
Seiten
212
Schlagwörter
Scheduling Problems in Logistics, Transport, Timetabling, Sports, Healthcare, Engineering, Energy Management
Kategorien
Informatik
Technik
Web-Books
Bibliothek
Datenschutz
Impressum
Austria-Forum
Austria-Forum
Web-Books
Algorithms for Scheduling Problems