Seite - 73 - in Algorithms for Scheduling Problems
Bild der Seite - 73 -
Text der Seite - 73 -
Algorithms 2018,11, 43
7. RĂos-SolĂs, Y.A.; RĂos-Mercado,R.Z. Just-In-Time Systems; Springer Sciences: NewYork,NY,USA, 2012;
ISBN978-1-4614-1122-2.
8. Shabtay,D.;Steiner,G.Schedulingtomaximize thenumberof just-in-time jobs:Asurvey. In Just-in-Time
Systems; RĂos-SolĂs, Y.A., RĂos-Mercado, R.Z., Eds.; Springer Sciences: New York, NY, USA, 2012;
ISBN978-1-4614-1122-2.
9. Choi, B.-C.; Yoon, S.-H.Maximizing theweightednumber of just-in-time jobs inflowshop scheduling.
J.Sched. 2007,10, 237–243. [CrossRef]
10. Shabtay,D.;Bensoussan,Y.Maximizingtheweightednumberof just-in-time jobs inseveral two-machine
schedulingsystems. J.Sched. 2012,15, 39–47. [CrossRef]
11. Shabtay,D.The just-in-timeschedulingprobleminaflow-shopschedulingsystem.Eur. J.Oper. Res. 2012,
216, 521–532. [CrossRef]
12. Gerstl, E.; Mor, B.; Mosheiov, G. A note: Maximizing theweighted number of just-in-time jobs on a
proportionateflowshop. Inf. Process. Lett. 2015,115, 159–162. [CrossRef]
13. Yin,Y.;Cheng,T.C.E.;Wang,D.-J.;Wu,C.-C.Two-agentflowshopscheduling tomaximize theweighted
numberof just-in-time jobs. J.Sched. 2017,20, 313–335. [CrossRef]
14. Fuchigami,H.Y.;Rangel,S.MĂ©todosheurĂsticosparamaximizaçãodonĂşmerodetarefas just-in-timeemflow
shoppermutacional. InProceedingsof theSimpĂłsioBrasileirodePesquisaOperacional,PortodeGalinhas,
Brazil, 25–28August2015.
15. Fuchigami, H.Y.; Rangel, S. Um estudo computacional de um modelo matemático para flow shop
permutacionalcomtarefas just-in-time. InProceedingsof theSimpĂłsioBrasileirodePesquisaOperacional,
Vitória,Brazil, 27–30September2016.
16. Dhouib,E.;Teghem,J.;Loukil,T.Minimizingthenumberof tardyjobsinapermutationflowshopscheduling
problemwithsetuptimesandtimelagsconstraints. J.Math.Model. Algorithm2013,12, 85–99. [CrossRef]
17. Nawaz,M.;Enscore,E.E., Jr.;Ham, I.Aheuristicalgorithmfor them-machinen-jobflow-shopsequencing
problem.OMEGA–Int. J.Manag. Sci. 1983,11, 91–95. [CrossRef]
18. Hodgson,T.J.Anoteonsinglemachinesequencingwithrandomprocessing times.Manag. Sci. 1977,23,
1144–1146. [CrossRef]
19. Baker,K.R.;Trietsch,D.Principles ofSequencingandScheduling; JohnWiley&Sons:NewYork,NY,USA,2009;
ISBN978-0-470-39165-5.
20. Nagano,M.S.;Branco,F.J.C.B.;Moccellin, J.V.Soluçõesdealtodesempenhoparaprogramaçãodaprodução
flowshop.GEPROS2009,4, 11–23.
21. Li,X.;Chen,L.;Xu,H.;Gupta, J.N.D.Trajectory schedulingmethods forminimizing total tardiness ina
flowshop.Oper. Res. Perspect. 2015,2, 13–23. [CrossRef]
22. Vallada,E.;Ruiz,R.;Minella,G.Minimizingtotal tardiness in them-machineflowshopproblem:Areview
andevaluationofheuristicsandmetaheuristics.Comput.Oper. Res. 2008,35, 1350–1373. [CrossRef]
23. Ronconi, D.P.; Birgin, E.G. Mixed-integer programming models for flow shop scheduling problems
minimizingthetotalearlinessandtardiness. In Just-in-TimeSystems;RĂos-SolĂs,Y.A.,RĂos-Mercado,R.Z.,
Eds.; SpringerSciences:NewYork,NY,USA,2012; ISBN978-1-4614-1122-2.
24. Taillard,E.Benchmarks forbasicschedulingproblems.Eur. J.Oper. Res. 1993,64, 278–285. [CrossRef]
25. Laha,D.; Sarin, S.C.Aheuristic tominimize total flow time inpermutationflowshop. OMEGA–Int. J.
Manag.Sci. 2009,37, 734–739. [CrossRef]
©2018bytheauthors. LicenseeMDPI,Basel,Switzerland. Thisarticle isanopenaccess
articledistributedunder the termsandconditionsof theCreativeCommonsAttribution
(CCBY) license (http://creativecommons.org/licenses/by/4.0/).
73
zurĂĽck zum
Buch Algorithms for Scheduling Problems"
Algorithms for Scheduling Problems
- Titel
- Algorithms for Scheduling Problems
- Autoren
- Frank Werner
- Larysa Burtseva
- Yuri Sotskov
- Herausgeber
- MDPI
- Ort
- Basel
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY 4.0
- ISBN
- 978-3-03897-120-7
- Abmessungen
- 17.0 x 24.4 cm
- Seiten
- 212
- Schlagwörter
- Scheduling Problems in Logistics, Transport, Timetabling, Sports, Healthcare, Engineering, Energy Management
- Kategorien
- Informatik
- Technik