Algorithms 2018,11, 55 (hm ) is theminimumtimebetweentwotrains jand j′ running in thesamedirectionandonthesame trackofsectionm. Theheadwaydistance is theminimumtimeintervalbetweenthestart times,and endtimesrespectively,of twoconsecutive trains, jand j′,whichcanbemodelledbyaddinganew arcwithaweighthm fromoperationoj,i tooj′,i′. TheaddArcprocedure is responsible foradoptingthe clear timeandheadwaydistance. Figure3, isan illustrationofconflict resolution,consideringtheclear timeandheadwaydistance for thealternativegraphmodel. InFigure3a, thestartingtimeofoperationo2,1 is increasedtominute 11,because, theoperationo1,1 had4minofprocessingtimeand1minofclear time. InFigure3b, the headwaydistance ish1= 7,whichmeans that thestart timeofoperation o2,1mustbeat least7min after thestart timeof theoperationo1,1. Thestartingtimeof theoperationo2,1 is increasedtominute13. 8 : 8 : Figure3.Addingtheclear timeandheadwaytimedistance to thealternativegraph: (a) thestarting timeofoperationo2,1 is increasedduetothecleartime; (b) thestartingtimeofoperationo2,1 is increased dueto theheadwaydistance. Foradecision-makingprocedure, thealgorithmneedssomedata,suchasreleasetime,orbuffertime. Afteranyre-timing,re-orderingor local re-routing, thesedatachange.Theexperimentsdemonstrate that recalculationof thesedatahasasignificanteffectonthecomputational timeof thealgorithm.Ourspecial visitingapproachenablesadynamicupdateofdatafor thosevertices thatwillbeaffected. Afteraddinganewdirectedarc fromtheoperationoj,i to theoperationoj′,i′, byconsideringthe commercial stoptime(passenger trainsarenotallowedto leaveastationbefore the initial completion time einitialj,i ) theminimumstart timeofanoperationoj′,i′onatrackm.uwillbe xbeginj′,i′ = ⎧⎪⎨⎪⎩ Max(binitialj′,i′ ,x end j′,i′−1, maxj∈O′m,u ( xbeginj,i +dj,i ) ) if i′−1wasacommercial stop, Max(xendj′,i′−1, maxj∈O′m,u ( xbeginj,i +dj,i ) ) if i′−1wasnotacommercial stop, (2) whereO′m,u is a set of all operations processed by the same resource u froma set Mm until now. Additionally, theendingtimecanbecalculatedas follows: xendj′,i′= ⎧⎨⎩max ( einitialj′,i′ ,x begin j′,i′ +dj′,i′ ) if i′ isacommercial stop. xbeginj′,i′ +dj′,i′ if i ′ isnotacommercial stop. (3) Consideringtheclear timerestriction, thestarting timeforanoperation oj′,i′willbecalculated as follows: xbeginj′,i′ = ⎧⎪⎨⎪⎩ Max(binitialj′,i′ ,x end j′,i′−1, maxj∈O′m,u ( xendj,i +cm ) ) if i′−1wasacommercial stop. Max(xendj′,i′−1, maxj∈O′m,u ( xendj,i +cm ) ) if i′−1wasnotacommercial stop. (4) 105
zurück zum  Buch Algorithms for Scheduling Problems"
Algorithms for Scheduling Problems
Titel
Algorithms for Scheduling Problems
Autoren
Frank Werner
Larysa Burtseva
Yuri Sotskov
Herausgeber
MDPI
Ort
Basel
Datum
2018
Sprache
englisch
Lizenz
CC BY 4.0
ISBN
978-3-03897-120-7
Abmessungen
17.0 x 24.4 cm
Seiten
212
Schlagwörter
Scheduling Problems in Logistics, Transport, Timetabling, Sports, Healthcare, Engineering, Energy Management
Kategorien
Informatik
Technik
Web-Books
Bibliothek
Datenschutz
Impressum
Austria-Forum
Austria-Forum
Web-Books
Algorithms for Scheduling Problems