Seite - 113 - in Algorithms for Scheduling Problems
Bild der Seite - 113 -
Text der Seite - 113 -
Algorithms 2018,11, 55
3. Lamorgese, L.; Mannino, C.; Pacciarelli, D.; Törnquist Krasemann, J. Train Dispatching. InHandbook
of Optimization in the Railway Industry, International Series in Operations Research & Management Science;
Borndörfer, R., Klug, T., Lamorgese, L.,Mannino, C., Reuther,M., Schlechte, T., Eds.; Springer: Cham,
Switzerland,2018;Volume268. [CrossRef]
4. Cacchiani, V.; Huisman,D.; Kidd,M.; Kroon, L.; Toth, P.; Veelenturf, L.; Wagenaar, J. An overviewof
recoverymodelsandalgorithmsfor real-timerailwayrescheduling.Transp. Res. BMethodol. 2010,63, 15â37.
[CrossRef]
5. Fang,W.; Yang, S.; Yao, X.ASurvey onProblemModels andSolutionApproaches toRescheduling in
RailwayNetworks. IEEETrans. Intell. Trans. Syst. 2015,16, 2997â3016. [CrossRef]
6. Josyula, S.; Törnquist Krasemann, J. Passenger-oriented Railway TrafïŹc Re-scheduling: A Review of
AlternativeStrategiesutilizingPassengerFlowData. InProceedingsof the7th InternationalConferenceon
RailwayOperationsModellingandAnalysis,Lille,France,4â7April2017.
7. Szpigel,B.Optimal trainschedulingonasingle trackrailway.Oper. Res. 1973,72, 343â352.
8. DâAriano,A.;Pacciarelli,D.;Pranzo,M.Abranchandboundalgorithmforschedulingtrains inarailway
network.Eur. J.Oper. Res. 2017,183, 643â657. [CrossRef]
9. Khosravi,B.;Bennell, J.A.;Potts,C.N.TrainSchedulingandReschedulingintheUKwithaModiïŹedShifting
BottleneckProcedure. InProceedingsof the12thWorkshoponAlgorithmicApproaches forTransportation
Modelling,Optimization,andSystems2012,Ljubljana,Slovenia,13September2012;pp.120â131.
10. Liu, S.; Kozan, E. Scheduling trains as a blocking parallel-machine job shop scheduling problem.
Comput.Oper. Res. 2009,36, 2840â2852. [CrossRef]
11. Mascis,A.;Pacciarelli,D. Job-shopschedulingwithblockingandno-wait constraints.Eur. J.Oper. Res. 2002,
143, 498â517. [CrossRef]
12. Oliveira,E.; Smith,B.M.AJob-ShopSchedulingModel for theSingle-TrackRailwaySchedulingProblem;Research
ReportSeries21;SchoolofComputing,UniversityofLeeds: Leeds,UK,2000.
13. Törnquist, J.; Persson, J.A.N-trackedrailwaytrafïŹcre-schedulingduringdisturbances.Transp. Res. Part
BMethodol. 2007,41, 342â362. [CrossRef]
14. Pellegrini,P.;Douchet,G.;Marliere,G.;Rodriguez, J.Real-timetrainroutingandscheduling throughmixed
integer linearprogramming:Heuristicapproach. InProceedingsof the2013InternationalConferenceon
IndustrialEngineeringandSystemsManagement (IESM),Rabat,Morocco,28â30October2013.
15. Xu,Y.; Jia,B.;Ghiasib,A.;Li,X.Trainroutingandtimetablingproblemforheterogeneous train trafïŹcwith
switchableschedulingrules.Transp. Res. PartCEmerg. Technol. 2017,84, 196â218. [CrossRef]
16. Corman,F.;DâAriano,A.;Pacciarelli,D.;Pranzo,M.Centralizedversusdistributedsystemstoreschedule
trains in twodispatchingareas.PublicTrans. Plan.Oper. 2010,2, 219â247. [CrossRef]
17. Corman,F.;DâAriano,A.;Pacciarelli,D.;Pranzo,M.Optimal inter-areacoordinationof trainrescheduling
decisions.Trans. Res. PartE2012,48, 71â88.
18. Corman, F.; Pacciarelli, D.; DâAriano,A.; SamĂĄ,M. ReschedulingRailwayTrafïŹc Taking intoAccount
MinimizationofPassengersâDiscomfort. InProceedingsof the InternationalConferenceonComputational
Logistics, ICCL2015,Delft,TheNetherlands,23â25September2015;pp.602â616.
19. Lamorgese,L.;Mannino,C.AnExactDecompositionApproachfortheReal-TimeTrainDispatchingProblem.
Oper. Res. 2015,63, 48â64. [CrossRef]
20. Meng, L.; Zhou, X. Simultaneous train rerouting and rescheduling on anN-track network: Amodel
reformulationwithnetwork-basedcumulativeïŹowvariables.Trans. Res. PartBMethodol. 2014,67, 208â234.
[CrossRef]
21. Tormo, J.; Panou, K.; Tzierpoulos, P. Evaluation and Comparative Analysis of Railway Perturbation
ManagementMethods. InProceedingsof theConférenceMondialesur laRechercheDans lesTransports
(13thWCTR),RiodeJaneiro,Brazil, 15â18 July2013.
22. Rodriguez, J. An incremental decision algorithm for railway trafïŹc optimisation in a complex station.
Eleventh. InProceedingsof the InternationalConferenceonComputerSystemDesignandOperation in the
RailwayandOtherTransitSystems(COMPRAIL08),Toledo,Spain,15â17September2008;pp.495â504.
23. Bettinelli,A.; Santini,A.;Vigo,D.Areal-timeconïŹict solutionalgorithmfor the trainreschedulingproblem.
Trans. Res. PartBMethodol. 2017,106, 237â265. [CrossRef]
24. SamĂ ,M.;DâAriano,A.;Corman,F.;Pacciarelli,D.Avariableneighbourhoodsearchfor fast trainscheduling
androutingduringdisturbedrailwaytrafïŹcsituations.Comput.Oper. Res. 2017,78, 480â499. [CrossRef]
113
zurĂŒck zum
Buch Algorithms for Scheduling Problems"
Algorithms for Scheduling Problems
- Titel
- Algorithms for Scheduling Problems
- Autoren
- Frank Werner
- Larysa Burtseva
- Yuri Sotskov
- Herausgeber
- MDPI
- Ort
- Basel
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY 4.0
- ISBN
- 978-3-03897-120-7
- Abmessungen
- 17.0 x 24.4 cm
- Seiten
- 212
- Schlagwörter
- Scheduling Problems in Logistics, Transport, Timetabling, Sports, Healthcare, Engineering, Energy Management
- Kategorien
- Informatik
- Technik