Seite - 43 - in Book of Full Papers - Symposium Hydro Engineering
Bild der Seite - 43 -
Text der Seite - 43 -
Fig. 1 Flood Control Outlet (FCO) Structure and Emergency Spillway, March 2011
This paper is part of a series to describe the Oroville Dam Spillway Incident
Emergency Response and Recovery. This paper focuses on the implementation of the
emergency response actions starting on February 7, 2017, and the actions taken in the
days and weeks after failure of the concrete in the FCO Spillway chute. It provides
detail of the incident as it unfolded, the decisions made to protect the public, the incident
command system, and the situation that led to the evacuation.
43
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik