Fig. 2 2017 Oroville Spillway Recovery design objectives projected onto an aerial
view of the damaged spillways at Oroville Dam
2.4. EXPEDITED ALTERNATIVE ANALYSES
On March 6, 2017, less than one month after the beginning of the incident,
an all-day alternatives workshop was conducted by DWR at the California Natural
Resources Building in Sacramento. The purpose of the workshop was to develop
reinforcement and replacement alternatives to restore the FCO Spillway chute
and the Emergency Spillway to meet the 2017 design objectives by November 1,
2017. Several restoration concepts were proposed for the FCO Spillway chute
and for the Emergency Spillway.
2.4.1. FCO Spillway Chute Alternatives
The FCO Spillway chute is a reinforced-concrete spillway approximately
54.5 m (179 ft) wide and 914 m (3000 ft) long. Alternatives for the relatively
undamaged 488 m (1600 ft) long FCO Spillway upper chute above the scour
holes included:
Repair-in-place
Remove and replace
Construct new FCO Spillway upper chute
69
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik