Fig. 5
Fig. 5 Plan view of 2017 and 2018 repair/replacement alternative measures for
the FCO Spillway chute
Table 1
2017 and 2018 Repair/Replacement Measures for the FCO Spillway chute
FCO Spillway
Chute
Reach Stationing
(feet) Length
(feet) Length
(meters) 2017
Construction 2018
Construction
Upper Chute 13+00 –
20+30 730 222 Minor repairs Replacement
20+30 –
28+20 790 241 Replacement -
Lower Chute 28+20 –
39+30 1110 338 RCC Backfill Structural
concrete
39+30 –
43+00 370 113 Replacement -
Total 13+00 –
43+00 3000 914 Replacement
2.4.2. Emergency Spillway Alternatives
The Emergency Spillway is an ungated monolith/weir structure that is
approximately 527 m (1730 ft) wide at the weir crest. The left 283 m (930 ft)
portion consists of concrete-gravity ogee monoliths/weir sections that were keyed
into slightly-weathered rock. The structural heights of the monoliths range as
high as 27 m (90 ft). The right 244 m (800 ft) portion is a cut section with a small
30 cm (1-ft) high concrete ogee weir. During the Oroville Spillway Incident, there
was great concern that rapidly developing head-cutting erosion under a relatively
22.5 m
Replaced
by Nov. 1,
2018 240.8 m
Replaced by
Nov. 1, 2017 338 m
RCC Chute by
Nov. 1, 2017 112.8 m
Replaced
by Nov ‘17
UPPER CHUTE LOWER CHUTE
72
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik