Web-Books
im Austria-Forum
Austria-Forum
Web-Books
International
Book of Full Papers - Symposium Hydro Engineering
Seite - 120 -
  • Benutzer
  • Version
    • Vollversion
    • Textversion
  • Sprache
    • Deutsch
    • English - Englisch

Seite - 120 - in Book of Full Papers - Symposium Hydro Engineering

Bild der Seite - 120 -

Bild der Seite - 120 - in Book of Full Papers - Symposium Hydro Engineering

Text der Seite - 120 -

[3] CRADDOCK T., HARDER L., VERIGIN S., KUTTEL J., BROWN D., MIHYAR M., BOYER D. Oroville Dam Spillway Incident – Fast Track Recovery Design to Address Critical Dam Safety. ICOLD World Congress Proceedings, 2018. [4] SNOW C.A., SHERER H. Terranes of the Western Sierra Nevada Foothills Metamorphic Belt, California: A Critical Review. International Geology Review, 2006, Vol. 48. [5] O’NEILL A.L., COKE K.J., MARLIAVE E.C. Geologic Report on Preliminary Exploration of the Oroville Dam Site. California Department of Water Resources, Project Geology Report No. 20-11-05, 1955. [6] HUBER O.L., GROSS D.J., MARLETT J.W. Final Geologic Report, Oroville Dam Spillway. California Department of Water Resources, Project Geology Report No. C-38 (20-11-26), 1970. [7] LAMKIN B.L., GLICK F.G. Oroville Dam Spillway, Results of Landslide Evaluation. California Department of Water Resources, Project Geology Report No. 20-11-35, 2004. [8] DUNBAR S., HOIRUP D., BARRY G.R. Oroville Dam, Emergency Spillway, and Flood Control Outlet, Drill hole and Shear Wave Velocity (Vs) Results. California Department of Water Resources, Project Geology Report No. 20-11-50, 2017. [9] DAM SAFETY REVIEW BOARD. Oroville Dam, FERC (Federal Energy Regulatory Commission) Project 2100-CA, State Dam No. 1-048, NID No. CA00035, CA00530, & CA83096, Ninth Five-Year Part 12D Safety Inspection Report, 2014 Director’s Safety Review Board, December 2014. [10] INDEPENDENT FORENSIC TEAM. Oroville Dam Spillway Incident Forensic Investigation Team (IFT), Preliminary Findings Concerning Candidate Physical Factors Potentially Contributing to Damage of the Service and Emergency Spillways at Oroville Dam, Forensic Team memorandum, May 5, 2017. SUMMARY Starting on February 7, 2017, a scour hole formed in the concrete-lined Gated Spillway chute at Oroville Dam. Continued intermittent releases between February and May 2017 led to further damage of the Gated Spillway chute and the creation of a large erosion scour channel to the left of the lower chute. During this time, the unlined Emergency Spillway was used for the first time to release reservoir flows. Significant erosion and scour of the weathered rock at the unlined 120
zurück zum  Buch Book of Full Papers - Symposium Hydro Engineering"
Book of Full Papers Symposium Hydro Engineering
Titel
Book of Full Papers
Untertitel
Symposium Hydro Engineering
Autor
Gerald Zenz
Verlag
Verlag der Technischen Universität Graz
Ort
Graz
Datum
2018
Sprache
englisch
Lizenz
CC BY-NC-ND 4.0
ISBN
978-3-85125-620-8
Abmessungen
20.9 x 29.6 cm
Seiten
2724
Schlagwörter
Hydro, Engineering, Climate Changes
Kategorien
International
Naturwissenschaften Physik
Technik
Web-Books
Bibliothek
Datenschutz
Impressum
Austria-Forum
Austria-Forum
Web-Books
Book of Full Papers