4.3 THE INFLUENCE OF RAISING INITIAL IMPOUNDING WATER LEVEL ON THE
DISCHARGE OF TGR DURING IMPOUNDMENT PERIOD.
According to the present situation of scheduling rules, TGR began to
impound from September 10th. compared with the 145m water level, if the initial
water level of TGR is raised up to 148m, 150m, 152m and 155m respectively,the
average discharge can be increased by 350m3/s, 590m3/s, 860m3/s and
1310m3/s during the impoundment period.Since 2010, TGR has been reached
to the normal water level of 175m for 8 consecutive years of water.Except for the
serious water shortage in early September and low water storage level in 2016,
the TGR initial storage level of other years were above 152m.The discharge of
TGR during the impoundment period was raised, effectively alleviating the
contradiction between reservoir water storage and downstream water use.
5. CONCLUSION
After the operation of the upstream large reservoirs, the runoff of Three
Gorges Dam from September to October is 9.7billion m3 and 22.2 billion m3 less
than that of the initial design value respectively, which has a great impact on the
impoundment of TGR.In the 2017 level year, that is the status quo year, it is
reasonable for TGR to start impounding on September 10 based on the current
joint storage of cascade reservoirs in the basin. But the initial water level should
be raised to the increase the discharge during the impoundment period.In the
prospective level year, due to the large storage capacity of new large reservoirs,the
impounding time of TGR will need to be arranged on September 1 in advance,in
order to reach the designed full storage rate .
The contradiction between the centralized storage and downstream water
supply will be further exacerbated after the operation of the constructed and
proposed reservoirs in the upper reaches of the Yangtze River .Therefore, the
water storage scheme of TGR needs to be optimized continuously.In general, the
impounding time of upstream reservoir is earlier than that of TGR. Therefore in the
preparation of the annual impounding scheme of TGR, raising up the reservoir
initial water level under the premise of ensuring the safety of flood control according
to the real-time progress and inflow forecast.The full storage rate of TGR could be
increased and the contradiction between reservoir water storage and water supply
in the downstream area will be relieved.
6. ACKNOWLEDGEMENTS
238
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik