Seite - 288 - in Book of Full Papers - Symposium Hydro Engineering
Bild der Seite - 288 -
Text der Seite - 288 -
Attachment 1
Unit Price Calculation of Spoil Bank Embankment
No. Description Unit Volume Unit Price
(Rp) Total
(Rp)
I Preparation
1 Preparation and Cleaning ls 1.00 10.00 10.00
2 Mobilization of Heavy Equipments trip 8.00 1,905.50 15,244.00
3 Preparation Inlet & Outlet Spoil Bank ls 1.00 1,930.00 1,930.00
II Spoil Bank Work
1 Land Cut and Mobilization m³ 1.00 12,785.00 12,785.00
2 Land Fill, Shape and Spreading of Soil m³ 1.00 5,983.00 5,983.00
3 Soil Compaction m³ 1.00 4,106.00 4,106.00
III Other Job
1 Final Cleansing ls 1.00 50.00 50.00
2 Cross Section Measurements cross 1.00 72.00 72.00
3 Documentation and Reporting ls 1.00 750.00 750.00
Total 40,930.00
288
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik