Figure 4. The condition of Sengguruh reservoir sedimentation
L'état de la sédimentation du réservoir de Sengguruh
Table 1. The historical changes of Sengguruh reservoir storage capacity
3.2. DREDGING WORK ON CURRENT CONDITION
Some control efforts have been made actually, both in stream or off
stream, one of them is by sediment dredging. This dredging activity has been
done routine every year from year of 2001 with an average dredging volume of
300,000 m3 / year using 2 (units) cutter suction dredger. The location of sediment
disposal area (spoilbank) spread out around the reservoir, meanwhile available
spoilbank is very limited and provides the new one is very costly. the dredging
has been done in the upstream area which is quite far away + 1,500-2,000 m
from hydropower intake due to get close of spoilbank location, to get low fuel
consumption, to maximize available dredgers production capacity which has
307
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik