3. HEPP POSO –1
3.1. Location
Hydroelectric Power Plant Poso-1 (4 x 30 MW Nett) is located in Poso River, administratively
located in the District of North Pamona, Poso regency, Central Sulawesi Province.
Geographically, the study area is located at position 120 ° 39'07.6 "- 120 ° 39 '35.8" east
longitude and 01 ° 39' 49.5 "- 01 ° 40 '23.1" South Latitude.
Figure 1.
Map of HEPP Poso-I, Indonesia
3.2. Purposes of HEPP Poso-I
Poso-1 Dam construction is part of Poso-1 hydroelectric project that serve as a regulating
dam through Poso River from Poso Lake in Central Sulawesi Province. The purpose of the
construction of Dams Poso-1 (regulating dam) is:
- Regulating water for electric power.
- Water supply in dry season.
3.3. Technical data
Reservoir
Normal water level : +511,7 m
Reservoir volume : 1,97 million m3
Reservoir area : 148 ha
Maximum water level : +512,7 m
Dam
Type : Gravity dam
Heigh from deepest foundation : 23,5 m
Dam volume : 62.547 m3
Crest lenght : 162,2 m
Width crest : 12 m
Freeboard : 2,3 m
Hydropower Plant
Central Building Type : Semi Underground
Installed capacity : 4 x 30 MW Nett (MW)
Turbine : Francis Vertical
402
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik