4. ADAPTATION OF OPERATION PATTERN OF CITARUM
CASCADE RESERVOIR
4.1 Operation of Citarum Cascade Reservoir.
The Citarum cascade reservoir has a net capacity of 2.0 x 109 m3,
where the net catch is determined from the elevation of the spillway and
the minimum elevation of the reservoir (at the Jatiluhur reservoir minimum
hydro operation). With annual flow of Citarum in Jatiluhur at ± 5.75 x 109
m3 equivalent to 49% of net capacity, it indicates that this Citarum
cascade reservoir is not designed to provide reserve reserves under long
drought conditions. The technical data on the Citarum cascade reservoir is
presented in as “Table 1”.
Table. 1
Technical Data of Citarum Cascade Reservoir
Name of Dam Saguling Cirata Ir. H. Djuanda
Operational 1985 1988 1967
Specific Reservoirs Data
Full supply level 643 m 220 m 107 m
Dead storage level 623 m 205 m 56 m*)
Minimum power level - - 75 m
Maximum storage 880 x 106 m3 1,973 x 106 m3 2,970 x 106 m3
Minimum storage 271 x 106 m3 1,177 x 106 m3 599 x 106 m3 **)
Surface area at max operating
level 49 km2 62 km2 83 km2***)
Hydropower Plant Data
Tail level (m) 252 103 27.0
Head loss (m) 28.4 4.0 1.0
Spillway characteristics Gated spillway Gated spillway Ungated (ogee)
spillway
Installed capacity (max. power,
MW) 750 1008 187.5
Number of turbines 4 units 8 units 6 units
Type of turbines Francis Francis Francis
Dam Data
Type Rockfill dam
with clay core Rockfill dam
with concrete
face Rockfill dam with
inclined clay core
Height 99 m 125 m 105
Crest length 301 m 453.5 m 1220 m
Crest elevation 650.20 m 225.0 m 114.5 m
Note: *) Based on the existing layout of guiding canal in front of hollow jet gates. **) at El. 49 msl
**) at El. 107 msl.
The annual operation of this Citarum cascade is made by estimating
the water requirement, the statistical data of inflows to the three reservoirs
with the total energy generated by the system optimized with priority
based on the fulfillment of water requirements downstream of the Ir. H.
Djuanda Dam. Water needs downstream of the Ir. H. Djuanda reservoir is
471
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik