plant located on the Zehlum River through a headrace tunnel. The specifications
of the plant are as follows.
Table 1.
Specifications of the Patrind Hydropower Project
Weir Intake Energy Generation
Catchment
Area Type Height Length Design
Discharge Turbine
Type Installed
Capacity Annual
Generation
Energy
2,400㎢ CGD 43.5m 167.6m 153.7㎥/s Vertical
Francis 150MW 641.3GWh
Fig 1.
Bird’s-eye View of Patrind Hydropower Project
2.2. SEDIMENT INFLOW STATUS
The project site is directly affected by sedimentation erosion from the
Himalayas. In order to check the amount of sediments flowing into weir, we
analyzed the discharge and suspended sediment observation data of the Garhi
Habibullah station, which is managed by WAPDA(Water and Power Development
Authority, Pakistan) and located about 12.3kms upstream of the project site, from
1960 to 2002. The sediment rating curve was made as follows through regression
analysis using the observed discharge and suspended sediment amount.
đť‘„
𝑆
𝑆 = 0.043 𝑄 2.86
đť‘„
𝑆
𝑆 : Suspended sediment load(ton/day), 𝑄 : Water flow(𝑚 3/𝑠)
In addition, the results of sieve analysis by discharge conducted by WAPDA
allowed for the prediction of the suspended sediment composition flowing into weir.
535
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik