Seite - 546 - in Book of Full Papers - Symposium Hydro Engineering
Bild der Seite - 546 -
Text der Seite - 546 -
COMMISSION INTERNATIONALE
DES GRANDS BARRAGES
-------
VINGT-SIXIÈME CONGRÈS DES
GRANDS BARRAGES
Autriche, juillet 2018
-------
ADVANTAGES OF DRY DAM AS FLOOD CONTROL
IN JAKARTA’S URBAN AREA
Airlangga MARDJONO
Head of West Division Dam Centre, Ministry of Public Works and Public Housing
Agus SAFARI
Chief of Dam Project, Ciliwung Cisadane River Basin Organization
Faris SETIAWAN
Chief of Sukamahi Dam Project, Ciliwung Cisadane River Basin Organization
INDONESIA
ABSTRACT
The Ciliwung River Basin population density is roughly about 5100 people
per km square. In the last ten years this number has increased rapidly. Ciliwung
river basin is located in 2 provinces, West Java Province (Bogor Regency, Bogor
City, and Depok City) in the upstream and middle reach and Capital City Jakarta
Province (South Jakarta, East Jakarta, Center Jakarta, West Jakarta, and North
Jakarta) in the downstream area. The dry dam is one of the alternatives for flood
control in the urban area, when the resettlement to be main issues in the urban
area.
Keywords: Dry Dam, Flood Control, Small Resettlement
1. BACKGROUND
546
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik