Summarising, following devices have been installed and continuously
monitored:
GPS installed on board (Fig. 14) of the pontoon to know in every moment
real time position of the submersible pump (x,y,z coordinates);
Sediment concentration device installed on board of the pontoon (on the
pumping pipeline) able to continuously record sediment concentration of
the “slurry”.
Fig. 14
Dredging pump positioning
Positionnement de la pompe de dragage
GPS coupled with topographic maps of the area to be dredged (Fig.
14) allowed to check every now and then if the dredging thickness required
by the Client has been respected.
According to Client’s requirement, sediment percentage in the slurry
has been continuously checked in three different positions: on board of the
pontoon, at the toe of the dam, and at the confluence between Ambiesta
stream and Tagliamento river. To correctly understand the location of the
dredging activity, the submersible pump productivity, and the new water
depths after dredging, the bathymetric survey, done using a multi-beam de-
vice (Fig. 15) just before dredging starting, has been compared to a second
survey, developed just after dredging activity (Fig. 16).
621
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik