3. KEY ENVIRONMENTAL CHALLENGES FACED BY THE PROJECT  It was challenging to relocate 128 household in terms of their resettlement and prospective litigation  Mira Power became aware of National Park notification after submission of initial environmental due diligence and original Environmental Social Impact Assessment (ESIA) to Environmental Protection Agency (EPA) and lenders for approval. Upon knowing of the notification regarding National Park further activity on the project was put on hold due to the new situation emerged with the appearance of critically endangered and endangered fish species within a legally notified area. The situation was pretty much alarming for Mira Power and was requiring immediate strategic interventions with reference to following mandatory requirements: 1) As per AJK Wildlife legislation ‘Betterment of the Park’ was mandatory to get approved actions and activities normally prohibited in a National Park 2) ADB and IFC in view of declaration of National Park and presence of Endangered Mahaseer and Critically Endangered Kashmir Catfish demanded ‘net environmental gain’ in biodiversity in Critical Habitant. 4. STRATEGY & IMPLEMENTATION To cope with the challenging problems Mira Power carried out following key studies/assessments to achieve sustainable development of the project:  Review of project design  A critical Habitat assessment study of the entire river in order to establish the actual status of biodiversity and ecological integrity of the river  A cumulative impact assessment of all projects planned on the river establish that if there is any room for considering the proposed project  An integrated ecological flow assessment of Gulpur Hydropower project assessing the upstream and downstream response of the project to establish any potential for achieving a net environmental gain and room for betterment of the park  A Biodiversity Action Plan demonstrating a net environmental gain and a net improvement in the national park In addition to challenge of relocation of 128 households Mira Power anticipated that the likelihood of achieving a net environmental gain with the original design having 6 kilometers of low flow/dry section with peaking scenarios will be difficult 658
zurück zum  Buch Book of Full Papers - Symposium Hydro Engineering"
Book of Full Papers Symposium Hydro Engineering
Titel
Book of Full Papers
Untertitel
Symposium Hydro Engineering
Autor
Gerald Zenz
Verlag
Verlag der Technischen Universität Graz
Ort
Graz
Datum
2018
Sprache
englisch
Lizenz
CC BY-NC-ND 4.0
ISBN
978-3-85125-620-8
Abmessungen
20.9 x 29.6 cm
Seiten
2724
Schlagwörter
Hydro, Engineering, Climate Changes
Kategorien
International
Naturwissenschaften Physik
Technik
Web-Books
Bibliothek
Datenschutz
Impressum
Austria-Forum
Austria-Forum
Web-Books
Book of Full Papers