govern the overall framework. Additionally the other documents of IFC and ADB
have also been used in shaping up and improving the system.
The construction of Gulpur project is carried out in accordance with the ESMS
implementation handbook (Construction) of IFC which is based on the most
common method Plan-Do-Check-Act cycle (PDCA). The system is based on
following elements as shown below in Fig. 6.
Fig. 6
Gulpur Hydropower Project – ESMS
5. STRATEGIC OUTCOME
After implementation of revised ESIA, land acquisition has been completed
without any significant relocation. The initial results after implementation of plans
developed for sustainability are very encouraging whereas hatcheries for critically
endangered Kashmir Catfish and endangered Golden Mahaseer are under
construction whereby a significant ‘net gain’ in the population of these species is
expected. We expect that the concept of net gain implemented for addressing the
environmental challenges while developing Gulpur HPP shall be the best solution
for various other projects not only on Poonch River rather other rivers as well.
This will set an international standard that how development and environmental
protection can work together for sustainable development.
663
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik