Table 4.
The Working Time of Cable Cranes Before and After Optimization (Min)
No Before optimization After optimization
Tim
es Volu
me Worki
ng
time Tot
al
tim
e Efficie
ncy Tim
es Volu
me Worki
ng
time Tota
l
time Effici
ency
1# 18 162.
0 762.0
8 15
72 48.48
% / / / / /
2# 81 729.
0 995.6
7 15
72 63.33
% 86 774.
0 1079.
3 139
6 77.31
%
3# 83 747.
0 959.8
3 15
72 61.06
% 89 801.
0 1112.
9 139
6 79.72
%
4# 81 729.
0 808.6
7 15
72 51.44
% 87 783.
0 1044.
5 139
6 74.82
%
5# 78 702.
0 1008.
18 15
72 64.13
% 79 711.
0 890.1 139
6 63.76
%
Table 5
The Statistics of collision
The type of Collision Collision Records Solution
Collision 1 45 Avoid
Collision 2 23 Avoid
Collision 3 0 Null
Collision 4 3 Avoid
Collision 5 0 Null
Collision 6 8 Avoid
Collision 7 19 Avoid
5. CONCULUSION
In this paper, according to the collision problem in high arch dam construction
process, the model of time-space evolution model for entities in the storehouse is
establish first. Then, the type and effect of the collision are analyze and the collision
detection and adjustment mechanism was established. At the same time, a
dynamic adjustment and optimization model of the construction scheme was
established. At last, a case study is carry out according to a real practice, and the
results shows that the method proposed in this paper can effectively provide a
scientific basis for decision-making of construction projects.
802
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik