BEHAVIOUR OF THE BACKFILLED RIGHT BANK OF THE MAVČIČE DAM
Pavel ŽVANUT
Head of the Project Team for Dams, SLOVENIAN NATIONAL BUILDING AND
CIVIL ENGINEERING INSTITUTE
Rudi BRINŠEK
Supervising Engineer, SEL - HYDROELECTRIC POWER GENERATION
COMPANY LTD
SLOVENIA
1. INTRODUCTION
The Mavčiče concrete gravity dam, part of the corresponding hydro-power
plant, was built on the Sava River, in central Slovenia (see Fig. 1), in 1986. It has
a maximum structural height of 38.5 m, and the dam crest has a length of 149 m.
The concrete dam structure consists of an erection bay, a machine hall, and two
spillways, followed by an embankment dam (see Fig. 2). The total capacity of
both spillways, which are closed by radial gates with flaps, is 3,200 m3/s. The
reservoir, which contains 10.7 hm3 of water, has a length of 7.0 km and the
surface area of 1.0 km2, whereas the catchment area of the reservoir is
1,480 km2 [1, 2].
820
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik