2. DAM CREST SETTLEMENT AND LEAKAGE PROBLEM
The differential settlement between the RCC spillway and the earth dam is
occurred causing the cracks and gaps at the RCC blocks. In the first filling, the
water overtopped the spillway and flow through the cracks and gaps. The
leakage was observed at the downstream crest near the contact area between
the RCC part and the earth zone part as shown in Figure 4. They are repaired by
the impervious membrane covering at the upstream surface of RCC blocks, the
leakage is reducing but stilling. The downstream population worried about the
safety of the Mae Suai dam especially in case of earthquake.
Fig. 4
Leakage occurred near the joint between RCC and earth fill,
the differential settlement is clearly seen
3. CHIANG RAI EARTHQUAKE AND RESPONSE OF DAM
Fears of an earthquake have deepened after 6.3 magnitude earthquake hit
the province in May of 2014. The epicenter to the dam site is 18 km. However,
the epicenter of the aftershock is closer to the dam site. Mae Suai Dam is located
in the active faults zone as shown in Figure 5. The dam experienced the strong
ground motion and the accelerometer at the right abutment recorded the
maximum PGA of 0.33g. Fortunately, the seismic force did not affect the Mae
Suai Dam. The dam performed well. There is some crack observed in the
concrete cover of the RCC block on the crest of the dam. The crack is much
885
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik