2. IR H. DJUANDA VISUAL INSPECTION
Based on the results of visual inspection and observation of the dam body
and its complementary building, that in general the dam Ir. H. Djuanda relatively
good and normal, with the condition of findings in the field, among others:
1. On the hillside there are several rip-rap rock spots happening dislocations, and
found grass and shurbs plants growing on the sidelines of rip-rap stones.
2. On the slopes downstream on the sidelines still visible grass and shrubs that
grow, the frequency of grass that needs to be reproduced so that the roots of
the plant does not penetrate the body of the dam that could be the outlet of
water seepage on the lining wall structure and lining paving blocks access
road to the dock.
3. Generally the condition of instrumentation in the main dam is relatively good,
but on OW5 protective wall made of concrete slab looks damaged and not
closed. The accelerometer installed in the Access Gallery of the tool is
damaged, the error sign continues and the voltage indicator panel shows 5.4
volts which should be +/- 11 volts. The condition of the surface monument has
small damage to the slope 9surface monument) which is located at the upper
lining of the dam top.
4. Conditions of drainage channels in some places at the foot of the dam and
downstream areas appear to be clogged with soil, moss and grass so that the
water flow cannot flow smoothly and inundated.
5. Rip-rap conditions are generally good, but need to be weaned and additions
around the C2 sliding mark downstream.
3. TOWER MAIN TOWER AND ACCESS GALLERY INSPECTION
Based on visual inspection and observation of the main spillway tower,
Access Gallery and its complementary building. In general the condition of the
main spillway tower and access gallery is relatively good and normal, with the
condition of findings in the field, among others:
a. The connection between the plates on the bridge ladder has already started to
loose due to run out by rust. And at some point bridge paint floor has begun to
fade, the handrail and steel rope reinforcement on the right and left side of the
bridge looks still pretty good.
b. There are cracks in the 3 concrete joints under the rails. Found the wild
vegetation around joint 9 then on joint 11. Three Dimension Instrument (3D)
Joint Apparatus looks rusty start and surface pin is not flat. The 3D Joint
Apparatus protective cover is largely unlocked because the lock nut is missing.
The sliding mark on the shoulders of the tower must be re-painted because the
962
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik