By analysing the differences in the water levels any potential adverse
impacts during the construction are determined, so as not to excessively increase
flood risk, deteriorate or even disable the functions of infrastructure facilities, or
even put the stability of levees at risk, etc. 2D velocity analyses allow for assessing
(the changes in) erosion risk in the wider flood area.
4.1. IMPACT OF THE HPP BREŽICE CONSTRUCTION PIT AND THE DIVERSION
CHANNEL ON THE RUNOFF REGIME
Prior to HPP construction, the occurrence of a 100-year return period event
(3750 m3/s) would result in a quarter of the entire discharge (approx. 900 m3/s)
flowing along the right floodplain between the Sava River and the Ljubljana–Zagreb
motorway. The location of the construction pit and the diversion channel
considerably change the velocity field; as the area of the construction pit is
excluded from the flow, throughput is decreased, and the currents are
redistributed, causing also a different distribution of depths, velocities, erosion, etc.
To minimise the costs of dredging the diversion channel, the best location for the
disposal site would be as close as possible to the channel, but the proposed
location for the disposal of the material on the right bank would further narrow the
already-narrow cross-section. The increase in water levels would increase flood
hazard upstream, while, in the narrow cross-section and downstream part, the
increased velocities or shear stresses would increase the erosion hazard on
agricultural land and the motorway. At the discharges investigated, the mere
construction of the construction pit would cause a rise in water levels in the left and
right floodplains by up to 45 cm, the effects of which would diminish about 2 km
upstream; this would require the construction of dikes near some settlements even
in the initial stages of constructing HPP Brežice. The overall impact of the
construction pit and the disposal sites would be sufficient to cause flooding of the
motorway at a 100-year return period event. The disposal of the material dredged
from the diversion channel at the right floodplain would partially obstruct the return
of water from the right retention toward the confluence of the Sava and Krka rivers,
which would increase the flood hazard vulnerability of the settlements upstream,
along the Krka River.
1143
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik