Seite - 1147 - in Book of Full Papers - Symposium Hydro Engineering
Bild der Seite - 1147 -
Text der Seite - 1147 -
the excavated material, in this construction phase the water levels would still
remain above the previous state only in the lower part of the right retention.
In stage 3 the middle third of the embankments is built. After the construction
of the embankments throughout the length the outflow of water from the channel
to floodplains is restricted to the section above the NPP Krško weir, the outflow
openings in the built embankments (of a length of approx. 100 m) in the middle
part, the inlet into the diversion channel, and the discharge over the relief system.
In the latter, the spillway crest elevation of a fully open relief system was
considered in the calculations, i.e. in the state where the concrete structure is built,
while the hydromechanical installations are still lacking.
In this construction period, retention areas during high waters would be
activated to a similar degree than upon the completion of the Brežice HPP,
meaning that in the retentions lower discharges than prior to HPP construction
would occur, and as a consequence also lower water levels in the most part of the
retention areas. To relieve the lower part of the right retention and reduce the water
mass spilling across the area at the construction pit, there are still two 100-m long
openings in the middle part of the reservoir envisaged (Figure 9). The location of
the opening on the left allows for as much outflow as possible (outer part of the
curve) to the left retention, while the opening on the right allows for a more
favourable flow field in the part between the construction pit and the motorway.
The increased mass of the water current from the middle to the lower part in the
right retention considerably weakens the transversal water current which is, due to
the shape of the construction pit and the diversion channel, directed transversally,
towards the motorway. The analysis of the velocity field of the final variant
confirmed this effect; at the same time, local velocities (or erosion hazard) and
local water levels along the motorway are not increased.
The final construction stage, which was critical mostly because of the
potential locally increased velocities and thus erosion hazard, comprised the
closing of openings in the embankments in the middle part, the closing of the
diversion channel, and the redirection of the flow through the spillways of HPP
Brežice. It was also necessary to determine the impact of redirecting the Sava
River through HPP spillways on flood safety and the impact on the ongoing works
at the reservoir (to estimate the possibility of damage) in the phase when the
diversion channel is partially or completely backfilled.
Figure 10 shows the velocity fields in the case of still active 100-m outflow
openings in the levees for the case with backfilled diversion channel (left) and the
still open diversion channel (right). As evident, the lower part of the right retention
between the HPP weir and the Ljubljana–Zagreb motorway was the most affected
by erosive action due to maximum flow velocities in retention areas. The
calculations have shown that erosion risk can be reduced if backfilling of the
diversion channel starts at a later stage, to preserve its discharge capacity as long
as possible. In the case of backfilling the diversion channel before completing the
embankments the erosion processes would be strongest at downstream ends of
the already finished embankments (openings in the middle part and before the
inflow into the diversion channel). Water current velocities up to 3 m/s would occur,
which can transport gravel and rubble up to a grain size of approx. 100 mm. By
preserving the diversion channel open it was possible, due to higher discharge
1147
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik