Seite - 1248 - in Book of Full Papers - Symposium Hydro Engineering
Bild der Seite - 1248 -
Text der Seite - 1248 -
– Trashbooms
– Reservoirs zoning
3. IMPLEMENTATION
In implementing the obligation to secure vital objects in in Sutami Dam,
Jasa Tirta I Public Corporation as the river basin organization that manage
Sutami Dam carries out several activities such as:
a) Installation of warning signs
b) CCTV Installation
c) Vehicles Restricted Area
d) Limitation of Vehicle Tonnage
e) Security Fences around Main Dams
f) Trash boom around hydropower intakes
The example of several activities conducted in order to maintained public
safety around dam can be seen in pictures below
Fig. 2
Installation of warning signs
1248
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik