level of 3.00 m. Dolomite stones were used to protect the dike faces and crest as
shown in Fig. 5. The length of the dike is also 250m. A monitoring basin was
constructed behind the dike body to monitor the overtopping and seepage.
Fig. 5
Geo-tube core dike design
Fig. 6 a, b and c shows a
photo of each dike option after the
completion of construction in April
2016.
a) Sand fences dike
b) Clay core dike c) Geo-tube core dike
Fig. 6
Dike options after construction
All dimensions are in meters
Geo-tube section details
1284
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik