indispensable measure of temperature control and crack prevention in concrete
dam [4, 5]. But, the pipe cooling of mass concrete are used in manual mode before
Xiluodu (Dam concrete pouring started in March 2009). This pattern of construction
and work is very rough, which cannot take full account of the related factors, such
as air temperature, pouring temperature, spacing of water pipes, construction
process, data collection and control method etc.
In fact, with the rapid development of information and automation control
technology, the research and application of intelligent control technology in the civil
industry are booming in recent years. There have been many successful cases of
applications for some specific areas [6-8]. How to apply information technology and
automation control technology to the dam concrete temperature control
construction, to solve the drawbacks of the traditional manual pipe-cooling
construction mode, and to further improve the quality of concrete in construction
and ensure the structural safety? This becomes an urgent problem to be solved in
front of water conservancy workers.
A real-time, online and personalized intelligent cooling control method and
system for a mass concrete structure (ICCS) is developed in this paper. The
proposed method is an important engineering measure to prevent the mass
concrete structure from cracking during the construction period. The proposed
controlling method and system were successfully used to guide the temperature
controlling of Xiluodu arch dam construction. The proposed novel method will be
beneficial to the design and construction of the similar projects for controlling
thermal stress of mass concrete structure. The following is a detailed introduction
to this system.
2. THE METHOD AND PRINCIPLES OF INTELLIGENT COOLING
CONTROL
2.1. BASIC PRINCIPLES OF INTELLIGENT TEMPERATURE CONTROL
Temperature is an important index of crack prevention of concrete dam. To
achieve the target, the intelligent control method changes the model of setting flow
as the control factor into the model of setting temperature as key factor. It follows
the three principles below: (1) control the highest temperature during the procedure
of cooling down, as well as the highest value in 3-7 days after the pouring of
concrete. (2) coordinate the temperature gradient in the whole procedure of cooling
down. (3) forecast or warn for anomalous values when the temperature suddenly
goes up or goes down. The principles are explained respectively as below.
1291
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik