3. LARGE INSPECTION DAM
3.1. KEULILING DAM INSPECTION
The regular and large inspection is part of the dam safety evaluation and
monitoring process, which purposed to comprehend
the condition of a dam related to the security of its structure, hydraulics and
operations, identifying the existing problems and
establishing suggestions for improving dam security. Large inspection, ie
thorough inspection of technical and non-technical aspects supposed to evaluate
the dam safety and emergency preparedness. This inspection was led by an
expert team who is experienced in the field of dams and at least assisted by
Geologists and Hydromechanists.The main work of the large dam inspection
executed in five of scope works;
a. Inventoring and reviewing the existing data
b. Field inspection work
c. Instrumentation and interpretation monitoring program
d. Analysis of inspection result
e. Report compiling
Three main surveillance conducted in the large inspection of Keuliling Dam
were visual inspection, underwater inpsection and major inspection. Visual
inspection was for ground and water investigating objects, such as dam surfaces,
auxiliary buildings, ridges and reservoir cliffs, hydro-mechanical equipment
including dam and supplementary buildings. The investigation was for cracks,
sub-drainage, crushing, dissolving, leaking, indication of deterioration of quality or
chemical reaction, and damage caused by erosion and cavitations. Also, it is
aimed to check the contraction joints for water resistance, as well as large signs
of expansion or contraction, and the difference in motion of adjacent concrete
blocks, the connection of the construction of either vertical or horizontal joints.
Elevation of dam crest, cantilever, supporting wall, column, or other wall
examined by using previous results as a benchmark to determine the movement
of construction. The aeration holes and other openings on the overflow launcher
or on the door must be free from mud and other deposits. This action was
directed to problems related to scouring and abrasion. Further, the construction
alsoinvestigated for: cracks, leaks, basins, springs, evaporating holes, incidence
of reed erosion, scouring, abrasion, excessive cultivation of plants, crest
straigthness, bumps and slopes, animal holes, deterioration of riprap quality as
well as other slope protective materials and so forth.
Underwater inspection is an investigation of objects under water that
executed by beaming or diving method. The objects explored in the upper slope
surface of the dam in order to determine the possibility of embankment,
avalanches, deterioration of slope protective quality and so on. Upper face of a
dam inspected to determine the possibility of cracks, material degradation or
openings resulting in increased seepage and leakage.
1317
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik