Figure 2. Main specification of The subject dam
2. ANALYSIS RESULTS
2.1. DISPLACEMENT MEASURING
The number of displacement measuring points in subject dam is 14 and
these are located at divided section of the subject dam. 5 points are on the dam
crest section, 3 points are on the upstream slope section, the others (6 points)
are on the downstream slope section. Currently, the displacements of each point
are measured automatically every hour.
In order to analyze the influence on earthquake, subject analysis period
was decided to 2 months which are Before and after 1 month based on the day
(12th, Sep. 2016) of occurring earthquake.
Table 3. Status for displacement measuring points of the subject dam
Classification Dam crest Slope
Total
Upstream Downstream
Displacement points (operated) 5 3 6 14
Spillway (3-Gate)
Hydro power plant Intake tower
Dam
Reservoir
1328
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik