Seite - 1333 - in Book of Full Papers - Symposium Hydro Engineering
Bild der Seite - 1333 -
Text der Seite - 1333 -
Figure 8. Location of leakage measuring system for the subject dam
In order to analyze the influence on earthquake, subject analysis period is
decided to 2 months which are Before and after 1 month based on the day (12th,
Sep. 2016) of occurring earthquake in common with displacement measuring.
Analysis for measured leakage data was performed by excluding the data
of rainy period because precipitation is negative influence to exact leakage
measuring.
Figure 9 shows status of leakage measuring for the subject dam. Simply
comparing with quantity of leakage before and after earthquake is not reasonable
because precipitation quantity and duration are different every times and analysis
period is relatively short term. Important point was that leakage status before and
after earthquake was similar, variation was stable. 16th September, Quantity of
leakage and turbidity were increased but decreased gradually after that. The
reason that leakage increased was precipitation.
Therefore, it seemed that leakage was not affected by earthquake and the
leakage measuring system be considered to have no problem to operate.
Leakage Measuring System Cutoff Wall
Upstream slope
Downstream slope
1333
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik