Seite - 1394 - in Book of Full Papers - Symposium Hydro Engineering
Bild der Seite - 1394 -
Text der Seite - 1394 -
COMMISSION INTERNATIONALE
DES GRANDS BARRAGES
-------
VINGT-SIXIÈME CONGRÈS DES
GRANDS BARRAGES
Autriche, juillet 2018
-------
RUBBER DAM CONSTRUCTION WITH NAVIGATION LOCKS
Paul OBERLEITNER & Rudolf FRITSCH
Partner & CEO
Hydro-Construct GmbH
AUSTRIA
1. INTRODUCTION
Gomti River is a main river in India and is passing the main capital Lucknow
in the Indian State Uttar Pradesh. The State Irrigation Department has developed
a river rejuvenation program with the following topics:
Upgrading of the existing Gomti Weir downstream of the Gomti Barrage
with a flexible weir structure
Upgrading comprises also the development of weir cascades
Improvement of the flood safety by structuring of the river banks
Creating a water surface with a reservoir with app. 400.000 m³ with a
constant water level
Improvement of water quality in the river stretch by collecting and
diverting of the sewage in a new pipe system
Enabling river boating in the reservoir and passing of boats through the
new weir by navigation locks
Alternative Studies carried out came to the solution that a flexible rubber
dam with a water filled regulation system meets the requirements as it bests to
reach the outlined targets and the economic feasibility. The rubber dam system
on the weir is added by navigation locks on both river banks for passing of boats.
In the navigation locks there are also moveable rubber dams installed.
1394
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik