The hydraulic behaviour of the old Gomti Weir with a fixed weir sill was
resulting in changing water levels depending on river flows. This was resulting in
a very small water surface during dry periods.
2.3. DESCRIPTION OF MAIN PARTS
The main sections of the new weir were built on top of the existing concrete
structure by removing more than 1 meter of concrete. The new weir slab has a
thickness of minimum 1.20 m and is made of reinforced concrete. The crown of
the rubber dam lies on EL 106.0 m, the design height of the reservoir at
EL 105.50 m.
Fig. 3
Cross section through main rubber dam section
For the regulation system water filling is foreseen. This system is providing
a more stable and precise regulation range over the whole dam height and is
designed for possible tailback up to EL 104.50 m also.
The clamping rail for the 4 weirs sections is fixed in 2 steps with 0.1 m so
that the height of rubber dam in downstream side is 3.20 meter.
The rubber membrane is double-clamped and has a minimum wall
thickness of 16 millimetres, with three woven fabric reinforcement layers to
provide sufficient rupture strength.
In case of flood the rubber dam will be regulated automatically according to
the flow until the whole membrane is completely deflated to the fixed weir sill.
1397
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik