The lack of resources for technical maintenance of the dams and
their structures brought some dam owners to the necessity either to
keep the corresponding reservoir permanently empty or to cut the
dam body and thus to prevent any further impounding. So, they also
prevented any flood risks for the downstream residents. Such
destruction is usually performed without any technical design and
compliance with the related legal requirements. Of course, the
result is devastating for the materials of the dam body, too.
The lack of resources (i.e. finances, qualified personnel, equipment
etc.) for technical maintenance of the small dams and their facilities
including for carrying out reparatory works sets many municipalities
as dam owners between the hammer of the legal requirements and
the anvil of resources.
The emphasis on environmental friendliness has led recently to
some curious legal requirements. For example, every new dam
must have a fish pass according to the Act for Fishery and
Aquacultures. In the process of legislation development, such
examples of nonsense should be cleared.
3.2. PERFORMANCE PROBLEMS DUE TO THE LACK OF TECHNICAL MAINTENANCE
The following issues due to the lack or even absence of technical
maintenance can be formulated with respect to the performance of the small
dams and to the related findings in [3, 4, 5] as well:
In general, often there has been no technical maintenance of the
dams and their facilities. There is no monitoring system, no
measurements and analyses of the technical conditions are carried
out. Usually, there is no technical documentation including drawings
left from the design and construction.
Settlement of the embankment at the central part of the dam. Thus,
the dam crest level has sunk below the maximum water level in the
reservoir, and the risk of crest overflow during flood conditions
strongly increases with all negative consequences of such event.
The legal requirement for cleaning the river bed 500 m downstream
of the dam is in general not held by the dam owner.
Many small dams have suffered some damages over the years of
operation without proper maintenance. They need a serious and
urgent repair for restoring their full operational functionality.
Otherwise, subsequent load impacts and floods could lead to heavy
damages of the dam body with possibly uncontrolled release of the
impounded water. Independantly how small this volume might be,
the resulting flood wave could certainly have severe consequences.
Erosion of the streambed downstream of the spillway. In some cases,
the structure of the spillway itself is in a good condition. However, the
following spillway race and the stilling basin (if available) have been for
1441
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik