years subjected to erosion without any maintenance and repair. Under
some particular geological conditions, this erosion may have become
quite intensive.
Damaged or clogged bottom outlet which leads to the necessity of
draining the reservoir only by means of an external temporary siphon.
With the time and without any maintenance, the spillway inlets of
numerous small embankment dams have clogged by floating debris
during relatively small flood events. Every time when there was flow in
such spillways, additional amounts of debris were added. Thus, without
cleaning the spillway inlet, the risk of dam crest overflow increases.
Non-maintained dam slopes with developed dense plant and tree cover.
These slope conditions heavily complicate the access to the dam crest
and all appurtenant structures.
3.3. PERFORMANCE PROBLEMS AFTER IMPACTS EXCEEDING NORMAL OPERATING
CONDITIONS
At several dams during flood events, the dam crest has been overtopped as
well, Fig. 1 [5]. Fortunately, these dams retained their overall structural integrity, and no
uncontrolled catastrophic release of the reservoir content occurred. However, the dam
body in such cases was damaged, and all necessary repair works had to be carried
out as soon as possible, for such dams to be able to further fulfill their basic operational
requirements.
Fig. 1
Damaged crest area after overflow
Zone de couronnement endommagée après débordement
1442
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik