time of the test paste shall not be 60 min shorter or 90 min longer than that of the
check paste made using distilled water according to ASTM C191.
3. BATCHING PLANT AND MIXING OPERATION [1, 2]
For RCC dams, the batching plant and mixing operations have an important
impact on the in-place properties of the RCC. Table 3 shows quality control
activates for batching plant and mixing operations.
When the batching plant is operating, the amount of all constituent
materials including cement, and each size group of aggregate, water and
admixtures shall be continuously controlled. A daily (24 hour basis) report shall
be prepared indicating the type, source, and quantity (actual and SSD basis) of
cement, each size group of aggregate, admixture, and water used during each
shift of plant operation, based on plant production records. The report shall show
the required mix proportions per cubic meter for each mix design, and the
average proportions for each mix calculated from the totals used during each
shift.
Table 3
Quality Control activates for batching plant and mixing operations
4. QUALITY CONTROL PLAN DURING CONSTRUCTION [1, 4, 5]
4.1. QUALITY CONTROL TESTS DURING CONSTRUCTION
During construction, all of QC tests should be performed according
technical specification in specified frequency. Table 4 shows typical quality
control tests for RCC dams.
1508
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik