above considerations. A minimum height of 2 m is necessary. For mechanized
handling of excavated material a minimum section of 2.5m x 2.5 m is required.
Approach Channel for diversion tunnel- The dimensions and alignment of the
excavated approach channel upstream from the river to the tunnel and of the
discharge channel to convey the water back to the river downstream are
determined by the hydraulic design requirements and the stable slopes for the
material excavated
4. THE TUNNEL SLOPE, LENGTH
The tunnel longitudinal slope, S, has no typical value as it depends on the
geometry of the river and the valley but generally is of the order of the riverbed
slope at the site. The effect of the slope is to add LxS to H. Therefore, if the slope
increases, the discharge capacity of the tunnel increases and the required
cofferdam height decreases. When S is significantly different from the average
value assumed, the effect on the cofferdam height estimated from guides in this
study should be accounted for. A circular diameter (D) of the tunnel is used to
represent and compute the tunnel cross-sectional area available for the flow. In the
case of the horseshoe section, the equivalent circular section should be employed.
L depends on the extent of the site needed to remain dry and is typically a few
tens of meters more than the base width of the dam. It is generally greater for
embankment dams than for concrete dams. In any given project, L is fairly fixed
and is not subject to optimization here. In the optimization attempt, D and H are
inter-related and vary together. Greater H requires smaller D and vice
versa.Longer tunnels are generally associated with smaller optimum diameter-
Doptimum regardless of Q and W and the support type. When the tunnel is very long,
an overly large tunnel must be avoided and heightening of the cofferdam should
be examined instead. It is prudent that some who follow the tradition of determining
D only by Q and W often overlook the simple fact of dependency of Doptimum on L.
Reservoir depletion tunnel comprises three sub-structures: Inlet Structure, Tunnel
body and Outlet Structure. Section of a depletion tunnel studied at Central Water
and Power Research Station is shown in Figure 4
1539
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik