Seite - 1593 - in Book of Full Papers - Symposium Hydro Engineering
Bild der Seite - 1593 -
Text der Seite - 1593 -
theoretical, technological and technical solutions for inconsistent pressure date in
an embankment under a large displacement conditions are effective for reducing
the sources of short-term errors.
It is to be noticed that there is a considerable quantity of embankment
structures, especially embankment dams, in which projects the designer has
preferred to resign the stress monitoring by total pressure cells. The current
technical and academic literatures implicate that this attitude is becoming rapidly
as an accepted design method of instrumentation of embankment structures. In
that case the only remaining solution for approximating the pressure ratios is
evaluating a pressure value by the average density of overburden materials
regardless of unequal layer compaction and arching phenomenon.
2. SOLUTIONS
2.1. CONVENTIONAL SOLUTIONS; CLUSTER CELLS WITHOUT EXCAVATION OF AN
INSTALLATION BANK
The non-uniform compaction of installation area causes a short-term local
arching and additional rotation on pressure cells. The most known practical method
for overcoming this rotation is embedding the cell by spreading soil without
excavation an installation bank. The compaction of soil in the bank by using a
lightweight roller results lower stiffness at the embedded sections than surrounding
fill.
In case of embedding the cell without excavation, using heavy machines for
compaction of first soil spreading is possible (Fig. 7). The installation of total
pressure cell in the large embankment projects through this method for overcoming
the short-term local arching and initial rotation is quite accepted everywhere.
However, these phenomena can cause an inconsistent pressure data during the
filling of first overburden layers, which is negligible compared to the full-scale
pressure and displacement. It would be very careless to account the short-term
non-uniform compaction, which would be adjusted during the construction time for
long-term source of error.
Fig. 7. Embedding cell by spreading soil; Minamiaiki dam (Ref. 4)
1593
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik