2.2. DESIGN AND TESTING OF GROUT MIXES
One of the major changes in rock grouting technology in recent years has
been the increased level of understanding, and almost universal application of
multi-component, balanced, stable grouts. Gone, thankfully, are the days of
highly unstable, high water content “neat” mixes wherein the only concession to
sophistication would be the (unnecessary) addition of superplasticizer and/or a
handful of dry bentonite. The dynamic stability of a particulate grout (“pressure
filtration coefficient”) is a fundamental control over its ability to penetrate fissures,
and is at least equally as important as its grain size and apparent viscosity.
Thus, contemporary HMG’s (“High Mobility Grouts”) can be regarded as “high
performance” in that they maximize the injection potential value from every grout
hole, instead of simply prematurely clogging up the fissures a very short, and
uneconomic distance from the borehole wall.
Acceptable grouts should have minimal bleed (< 2%,), and low pressure
filtration coefficient (a value of 0.06 min-1/2 is suitable for most cases).
Reflecting current “Apparent Lugeon Theory” practice for controlling injection,
dominant now in N. America, these grouts can be manufactured in the field to
provide mixes with discrete Marsh Cone ranges, e.g., 35; 45; 60 seconds; and
infinite. Bear in mind that Marsh Cone readings over about 60 seconds are
imprecise measurements, and other measures such as a Flow Cone or Shear
Vane might be required, especially for the “closer” mix. The Baroid Mud Balance,
for measuring grout specific gravity, and hence checking water:cement ratio, is a
particularly simple, cheap and accurate tool, and stands in sharp contrast to the
systematic use of grout cubes as a QC/QA tool: practically useless in rock
fissure grouting applications. The true goals of a remedial grouting program
should be permeability and seepage reduction, and not production of the highest
strength grout cubes possible.
2.3. PLACEMENT AND SEALING OF STANDPIPES AND MPSP’S
This is a process the quality of which is frequently overlooked, even though
it is absolutely fundamental to the safe grouting of existing embankment dam
foundations.
The USACE Engineering Regulation [7] provides significant discussion on
the potential for hydraulic fracturing while backfilling drill holes through
embankments. This has led, in some quarters, to the development of
specification provisions that require that grouting of standpipes installed through
an embankment be performed in stages. A concern over hydraulic fracturing has
also led to specifications that require water testing and grouting be performed
under very low pressures or under gravity head. The following is a quote from
the current version of the Regulation.
“For borings that penetrate zones with low confining stress it is possible to
induce hydraulic fracturing from the gravity pressure. When grouting borings in
1614
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik