these locations or if significant grout losses are observed, the grout backfilling
should be done in stages allowing the grout to set between stages.”
This statement in the Regulation, together with concerns regarding
embankment hydraulic fracturing, have resulted in grouting specifications that
limit backfilling of the annular space outside of a standpipe (“casing grout”) to
heights of only 10-15 m above the water table. Such requirements are extremely
expensive to implement as they require that a drill rig and crew be kept on
standby for days for each standpipe installed. Stage grouting of the standpipe
annular space also results in the risk of grouting the drill casing into the
embankment if the casing is not pulled far enough, or for the embankment to
collapse around the standpipe when the casing is pulled above the grout level.
Such staged requirements might be an affordable conservative
approachwhen drilling a limited number of borings for investigation or installing
instrumentation. However, in the case where grouting is being performed as a
pretreatment for future cutoff wall construction, these requirements are
considered to be nonsensical by the authors. The grouting program in these
cases is an investigation and treatment program in advance of performing much
larger and riskier excavations through the embankment. In the case where a
slurry-supported trench is being considered for the cutoff wall construction, this
large excavation will be uncased. It seems logical that if a zone of the
embankment were prone to hydraulic fracturing under gravity head, the Engineer
would want to determine this during the grouting program where only small
diameter holes are being drilled, the fluid being used is self-hardening and the
fluid quantity is limited and can be easily controlled. If these zones of low
confining pressure are not discovered and treated by the grouting program in
advance of the cutoff wall construction, the continuous slurry filled panel or trench
will most certainly “discover” this zone of weakness. The surface area and
volume of non-hardening bentonite slurry in a typical panel excavation is orders
of magnitude greater than the surface area and annular space volume around a
typical drill hole. Furthermore, if a hydraulic fracturing event does occur during
panel wall excavation resulting in slurry loss, the specified procedure is to add
slurry to maintain the trench full (i.e. maintain the pressure the caused the
fracture to propagate). It seems obvious that the more cautious and prudent
approach is to identify any weak zones during the course of the drilling and
grouting program and to systematically treat the identified weak zones by
compaction grouting or other means prior to excavating uncased higher risk
elements through the dam embankment.
Counter to grouting standpipes in stages, some recent grouting programs
have elected to limit the amount of annulus standpipe grout used during
installation, as a predetermined multiple of theoretical annulus volumes. In these
cases, the standpipe annulus was being grouted through the bottom of the
standpipe under gravity head. This approach poses several concerns in regards
to the effectiveness of grout treatment and more importantly in regards to dam
safety. First, the act of prematurely halting the addition of grout into a formation
that is readily accepting the grout is counter to the very goals of the grouting
program. Second, not continuing to provide grout during the standpipe
installation allows for potential incomplete filling of the hole annulus, as the
1615
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik