completed between 1950 and 1979, while the median age in the year 2018 is
about 67 years.
Fig 1
U.S. dams by completion date. (From National Inventory of Dams, CorpsMAP,
http://nid.usace.army.mil, 2010.)
Whereas it may be calculated from the National Inventory of Dams [2] that
the cumulative “end-to-end” length of all the U.S. dams is around 18,000 miles,
preliminary estimates put the cumulative length of levees in the U.S. at over
120,000 miles. Only about 14% of this total may be regarded as federal, and
considered by Halpin [3] as “robust.” The balance includes municipal, local and
agricultural structures often featuring little engineering design, patchwork
construction and minimal periodic maintenance, since they were traditionally
regarded as “simple” structures.
Certain design assumptions and construction techniques used in the dams
and levees built prior to, say, 1960, would not be acceptable today, and have left
behind fundamental flaws in some structures. Appropriate filter criteria for
embankments and uplift/sliding issues in concrete dams are two obvious design
related examples, while old approaches to rock surface preparation and
foundation treatment would also fall into the unacceptable category. In addition,
there are two overriding geological considerations which directly influence the
serviceability, reliability, and performance of the dam and levee system. These
considerations are (i) the presence of carbonate and evaporite formations, and
(ii) the potential for seismic activity.
Focusing on point (i), there is a huge swath of karstic limestones and
dolomites which outcrops from Pennsylvania to Alabama, while it is estimated [4]
that evaporites underlie about 40% of the contiguous 48 states. These potentially
soluable and erodible foundation conditions underlie many of the major river
basins, such as the Mississippi-Missouri basin, and the Tennessee and Ohio
River Valley systems – and, of course, the aging dams built thereon.
Beginning with the first Wolf Creek Dam KY remediation in 1975, one can
tabulate 27 major cutoff walls which have been built through and under the
existing embankment dams, to counteract increasing seepage trends, and the
erosional dangers these seepages pose to dam and foundation alike. This paper
presents the lessons learned from these projects.
1625
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik