The investigatory program must inform the design of the cutoff, and produce
information essential for bidders to select their construction methods,
estimate productivities, and evaluate construction risks.
All investigations must be conducted in accordance with prevailing standards
of care for drilling in dams/levees, and for environmental protection.
Even the investigatory program may require a certain enhanced level of
instrumentation monitoring during its implementation.
3.1.2 Geotechnical Reports
Many different types of Reports can be produced on a project including:
Geotechnical Data Report (GDR),
Geotechnical Interpretive Report (GIR),
Geotechnical Baseline Report (GBR),
Geotechnical Design Basis Report (GDBR).
It is essential that at least the GDR, GIR and GDBR are shared with all
bidders, in full. GBR’s are relatively uncommon outside the tunneling
industry, and have very well-defined contractual and legal significance. The
goals of these Reports, considered together, must:
allow development and understanding of an accurate hydrogeological
model,
permit the Engineer-of-Record to design a responsive cutoff,
ensure that all bidders are on a “level playing field” when preparing their
submittals,
clearly identify areas of particular geotechnical construction or
performance risk,
permit the implementation of an appropriate geotechnical plan to monitor
conditions before, during and after construction.
3.1.3 General Principles of Cutoff Wall Design
Plan Location: A cutoff is typically located on the centerline of the
embankment (for access reasons), or on upstream slope (to save footage
and to ensure tie-in to sloping cores).
Length: Determined by flow analysis to ensure minimal “end around”
seepage. Most cutoffs actually tie-in to existing concrete structures, such as
spillways or powerhouses. Their far end typically is determined by the
geology and topography of the site (i.e., width of abutment).
Width: The minimum continuous width (typically 0.3 to 0.6 m) should
primarily be determined by the depth of the wall, the variability of the geology,
the composition of the wall, and its performance requirements. Note that a
cutoff wall does not have to be perfectly vertical to satisfy its design function:
it can “ripple” provided the minimum inter-element overlap thickness is
satisfied.
Depth: The terminal elevation of the toe must be chosen to reflect the
geological conditions and the design concept of the wall:
a “full depth” cutoff into effectively impermeable rock; or
1628
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik