a “partial depth” (or “floating”) cutoff, to reduce (not eliminate) seepage
and/or to prevent internal erosion. Such walls are often constructed
through previously installed grout curtains (minimum 2 rows), intended to
investigate the ground, pretreat voids to prevent sudden slurry loss; and
grout to say < 3 Lu the rock mass under and around the wall in “clean
fissure” conditions. This is the concept of the “composite wall” [6].
Material Properties:
In-situ permeability (especially at joints) must be established, and verified.
It is typically ≤ 10-8 m/s for materials, but 1 Lu for joints (i.e., approximately
1 x 10-7 m/s).
Strength and deformability must reflect the project conditions (e.g., plastic
concrete vs structural concrete). All materials must be non-erodible in
service.
Homogeneity must be emphasized, e.g., no inclusions of native ground or
bentonite slurry, no segregation of the backfill, no contamination of the
joints (or the toe) with slurry.
Durability/chemical compatibility must be addressed, but is typically not a
problem.
3.1.4 Risk and Performance Considerations
In dam safety considerations, Risk = Probability x Consequence.
Risk is to be assessed in Potential Failure Mode Analysis sessions (PFMA).
The individual PFM’s, appropriately prioritized, must drive the remedial
requirements and the instrumentation requirements.
The performance of the cutoff and the existing structure must be measured
during construction, and after construction. Specific project goals must be set
and verified, e.g.:
reduction in seepage,
acceptable piezometric performance,
elimination of other “signs of distress” (e.g., settlements, sinkholes, muddy
flows, boils).
The evaluation of risk may dictate the sequencing and prioritization of the
work and the permissible remedial techniques.
3.1.5 Durability of Walls
The actual backfill materials must be durable. This will be proved by
laboratory testing (“pinhole erosion”), quality of construction, and conditions of
curing and service.
There may be some evidence of cracking in old diaphragm walls, but the
case is not proven. Newer walls have intense in-situ verification and superior
long-term performance monitoring.
Desiccation cracking may be a concern in embankments where the upper
part may be above water level for most of its service life. However, the
typical cross-sectional shape of an embankment is favorable (i.e., very
broad).
1629
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik