core or percolating the grout curtain.
The spillway is located at the right abutment. It is a free flow weir followed by
a rapid channel and a 10m diameter tunnel. The end is a flip bucket leading to
downstream river bed. The bottom outlet and mid height outlet are also in the right
abutment and connected with spillway tunnel.
Fig.1
Gura Apelor Dam – cross section, geology and downstream view
The foundation rock is made up of a complex of crystal shale and granite
gneiss. The right slope, the river bed and the left slope below 950 mASL consist in
gray quartz shale with greenish chlorine-sericitous bands. The left slope above
elevation 950 mASL up to elevation 1,030 mASL is made up of tectonised,
breciphied graph shale. Above the 1030 mASL the right bank is made of granitoid
1649
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik