ASSESSMENT OF HYDRO TASMANIA’S CONCRETE DAMS AND
IMPACT OF UPLIFT
Richard HERWEYNEN
Principal Consultant - Civil, ENTURA
Tim GRIGGS
Senior Dam Engineer, ENTURA
AUSTRALIA
1. INTRODUCTION
Hydro Tasmania is the State-owned generation company for the island of
Tasmania, Australia. Hydro Tasmania’s power system includes 55 large dams,
30 hydropower stations and two major wind farms and has a total installed
capacity of over 2000 MW of hydropower and 300 MW of wind.
Hydro Tasmania’s portfolio of dams is ageing, with more than 30 of the
dams now more than 50 years old. As a result there has been increased effort to
understand the risks associated with this ageing portfolio of dams. Hydro
Tasmania has had an active dam safety program since the early 1970s. This
program was initially structured around dam surveillance activities; however, in
the past two decades risk assessment has become the framework for the
program. A full portfolio risk assessment was completed in 2006, which forms the
basis for risk-based decision making in relation to dam management.
Hydro Tasmania’s dam portfolio consists of a number of different types of
dams including a total of 12 concrete gravity dams, ranging in height from 6 m to
49 m.
1668
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik