Seite - 1675 - in Book of Full Papers - Symposium Hydro Engineering
Bild der Seite - 1675 -
Text der Seite - 1675 -
After the piezometers were installed, 95 new drainage holes were drilled
from the gallery into the foundation to improve the drainage efficiency. The new
drains were 75 mm diameter compared to the existing drain size of 32 mm.
3.2. REVIEW OF MONITORING DATA
A detailed review of the effectiveness of the foundation drainage upgrade
was undertaken by monitoring the piezometric pressure before and after the new
drainage holes had been drilled. The results of this assessment are provided in
Table 1.
Table 1
Clark Dam – Review of foundation drainage effect on piezometric pressure
Table 1 indicates that drilling the new drainage holes resulted in an average
pressure reduction across the dam of 10%, or 2.5 m of head. The maximum
pressure reduction achieved was 53.2%, equating to 11.6 m head relieved from
piezometer P03. It is noted that piezometer P04 pressure increased 1% of
previous reservoir depth after the works; however, this piezometer had some
1675
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik