installation issues that required removal and subsequent re-insertion which may
have increased the pressure slightly.
4. CONCLUSIONS
This paper has outlined the process and reasoning behind upgrade of
foundation drainage for Hydro Tasmania’s concrete dams.
An important part of the process undertaken was the measurement of
foundation pressures before and after foundation drain upgrades/maintenance to
quantify the state before and after and the impact of the drainage.
An upgraded drain size of 75 mm was adopted in both case studies with
varying results. The foundation drainage upgrade at Clark Dam was noted to be
more effective than at Trevallyn Dam. This could be due to the smaller initial
drain size at Clark Dam (32 mm diameter) compared to Trevallyn Dam (50 mm
diameter) or drain cleaning at Clark Dam being less frequent previously than at
Trevallyn Dam.
The data provided in this paper is considered to be of value to the wider
dam engineering industry.
REFERENCES
[1] GRIGGS T. Hydro Tasmania – Concrete Dams – Review of Monitoring.
Internal report for Hydro Tasmania, 2005.
[2] JOHNSON L. Clark Dam Foundation Drain Upgrade – Post-Construction
Report and Grout Curtain Defect Investigation, Internal report for Hydro
Tasmania, 2012.
1676
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik